Sidewalk Install
ESTIMATE
Project/Service Name: Sidewalk Install
Client Name: Lisa
Prepared By: [Your Company Name]
Date: [Today's Date]
Estimate Number: [Unique Number]
Executive Summary
This estimate outlines the costs and timeline for the demolition of the existing sidewalk, grading the area, and pouring a new sidewalk. Our team will ensure a high-quality installation that meets all local regulations and specifications. The project is expected to be completed within one week by a team of three experienced laborers.
Detailed Breakdown of Costs
1. Labor Costs
Laborers (3 laborers @ $25/hr)
Estimated Hours: 40 hours
Total Labor Cost = 3 laborers Ć 40 hours Ć $25/hr = $3,000
2. Material Costs
Concrete (450 sq ft @ $150/yd)
Estimated Volume: 5 cubic yards (450 sq ft x 0.5 ft depth)
Total Material Cost = 5 cubic yards Ć $150/cubic yard = $750
Reinforcement (rebar/stirrups)
Total Material Cost = $150
Gravel/Base Material for Grading
Total Material Cost = $100
Sawcutting and Disposal of Existing Sidewalk
Total Material Cost = $250
3. Equipment Costs
Concrete Mixer Rental (1 week)
Total Equipment Cost = $200
Tools and Equipment (saws, trowels, etc.)
Total Equipment Cost = $100
4. Miscellaneous Costs
Permit Fees (if applicable)
Total Permit Cost = $100
Total Estimated Costs
Labor: $3,000
Materials: $1,350
Equipment: $300
Miscellaneous: $100
Subtotal: $4,750
Timeline with Key Milestones and Deliverables
Day 1: Demolition of existing sidewalk
Day 2: Grading and preparation of subbase
Day 3: Setup for pouring concrete (rebar installation)
Day 4: Pouring concrete
Day 5: Finishing and curing of concrete
Day 6: Clean up and final inspection
Day 7: Project Wrap-up and handover
Payment Terms and Schedule
Deposit: 30% of the total estimated cost ($1,425) due upon acceptance of the estimate.
Progress Payment: 50% of the total estimated cost ($2,375) due upon completion of grading work.
Final Payment: 20% of the total estimated cost ($950) due upon project completion.
Assumptions and Exclusions
The estimate assumes that all work will be performed during regular working hours (Monday to Friday).
It assumes favorable weather conditions for the duration of the project.
Any unforeseen conditions (e.g., underground utilities) that may arise during excavation are not included in this estimate and may result in additional costs.
The estimate does not include landscaping or other site restoration work beyond the sidewalk installation.
Terms and Conditions
This estimate is valid for 30 days from the date issued.
Changes to the scope of work will require a revised estimate.
Payment terms are subject to credit approval.
The contractor will not be liable for any delays caused by third parties or unforeseen circumstances.
Work will conform to all local building codes and standards.
Thank you for the opportunity to submit this estimate! If you have any questions or require further clarifications, please do not hesitate to reach out.
Prepared By:
[Your Name]
[Your Position]
[Your Company Name]
[Your Phone Number]
[Your Email Address]