Toolbox talk example: ladder safety
Residential framing crew, start of the week. Short (5 minutes).
Written from these notes
Ladder safety. Framing crew of 8, setting second-floor walls this week. Near miss Tuesday: extension ladder slid on wet plywood, nobody hurt. Residential construction.
Toolbox talk: Ladder safety
Why it matters: This week we're setting the second-floor walls, so we'll be up and down ladders all day. The ladder is the tool we use most and think about least.
What can go wrong:
- The base slides out, like the extension ladder that slid on wet plywood on Tuesday.
- The ladder tips sideways when someone leans out too far.
- Someone misses a rung while carrying material.
- The top shifts when you step off onto the deck because it isn't tied off.
How we stay safe:
- Check the ladder before you climb: feet, rungs, locks and labels. Tag out any damaged ladder.
- Set it on firm, level, dry footing. If the plywood is wet, dry it or move the ladder.
- Set an extension ladder at a 4-to-1 angle: one foot out for every four feet up.
- Extend it at least 3 feet above the landing, and tie it off at the top.
- Keep three points of contact. Carry tools on your belt or haul them up with a rope.
- Keep your belt buckle between the rails. If you can't reach, climb down and move the ladder.
- Never stand on the top step or the top cap of a stepladder.
[Check your site rules and the regulations that apply to ladders.]
On our site this week: On Tuesday, an extension ladder slid on wet plywood. Nobody was hurt, and we want to keep it that way. Every time you set up on the deck this week, check the footing first. There are eight of us on these walls: if you see a ladder set up wrong, say something.
Discussion questions:
- What could have stopped the ladder sliding on Tuesday?
- Where on this job is it hardest to set a ladder safely?
- When should we use scaffolding or a lift instead of a ladder?
Key takeaway: Check the footing, keep three points of contact and tie it off, every climb.
Sign-in sheet: Topic: Ladder safety · Date: ________ · Location: ________ · Presenter: ________
| No. | Name (print) | Signature | Trade or company |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 |




